Water Rights Texas

A plain guide to who gets Texas water

Texas water rights, plain and simple

Texas splits water two ways. Creeks and rivers belong to the state and usually take a permit. The water under your land is yours, but your local groundwater district sets the pumping rules. Start with a guide below, or try the quick check.

Last updated Nov 17, 2026. By Ryan Trammell, Texas Hill Country (why I started this site). An independent guide, not a law firm and not a government site.

This is general information, not legal advice. For your own land or well, talk to a Texas water lawyer, your groundwater district, or TCEQ.

Plain guides for Texas landowners

Who owns the water in Texas?

Surface water in a creek, river, or lake is owned by the State of Texas. You usually need a TCEQ permit to take it, with some exemptions such as domestic and livestock use. Groundwater under your land is generally your property under the rule of capture, but a local groundwater conservation district can still regulate pumping. TCEQ TWDB

Surface water

Creeks, rivers, lakes.

  • To take (divert) water from a state watercourse, you need a permit, unless the use is exempt. TCEQ
  • Water for your house and your livestock may be exempt. TCEQ
  • Permits come from the Texas Commission on Environmental Quality (TCEQ). TCEQ form
  • In a shortage, older rights come first. TCEQ

Groundwater

Wells, springs fed from below, aquifers.

  • Texas has followed the "rule of capture" since a 1904 court case, East. TWDB
  • In 2012 the Texas Supreme Court said groundwater in place is a real property interest. Baylor Law
  • Local groundwater conservation districts regulate it under Chapter 36 of the Water Code. TCEQ
  • Each district has to keep a management plan. TWDB

Go deeper: surface water guide · groundwater guide

Follow the water on one Texas place

Tap a number on the drawing, or a button below, to see which rule applies.

Cross-section of a Texas place A simple side view: a house and livestock tank, your well, a creek with a stream gauge, a neighbor's big well, and an aquifer underneath, with a downstream user beyond the creek. Rock below the aquifer Aquifer Creek Your well Stream gauge Neighbor's big well Downstream user water flows downstream → 1 2 3 4 5 6
  1. 1. The creek is a state watercourse Pumping or diverting water out of it takes a permit from TCEQ, unless the use is exempt. An uncontested permit application is typically processed in about 300 days; a contested one takes longer. TCEQ drought page TCEQ form 10214a
  2. 2. Water for the house and the cows Domestic and livestock users may be exempt from needing a surface water permit. Ask TCEQ before you count on it for your situation. TCEQ
  3. 3. Your well Groundwater follows the rule of capture, which Texas courts took up in the 1904 East case. In 2012, in Edwards Aquifer Authority v. Day, the Texas Supreme Court said groundwater in place is a real property interest. TWDB Report 361 Baylor Law
  4. 4. The neighbor's big well The rule of capture is about pumping what is under your own land, and your neighbor has the same rule. That is why the local groundwater district matters: where one exists, it regulates groundwater under Chapter 36 of the Water Code. TWDB Report 361 TCEQ
  5. 5. The aquifer and your groundwater district Groundwater conservation districts must keep management plans. The TWDB lists every district, so you can find yours and read its rules. TWDB district list
  6. 6. Who's first in a shortage Surface water runs on "first in time, first in right." Senior (older) rights get their water before junior (newer) ones, and junior rights may be cut back. In some basins, a state watermaster watches streamflow, stops illegal diversions, and divides water by priority. TCEQ TCEQ watermasters

Who's first in line when the creek runs low

Three permit holders on the same stream, oldest first. Press the button to see a dry spell.

  • Oldest right
  • Middle right
  • Newest right

Normal year: there is enough water in the stream for every permit holder.

A simplified picture of "first in time, first in right," not a model of any real stream. Source: TCEQ, Water Rights and Water Use During Drought.

Latest Texas water updates

  • Deadline Jan 13, 2027TWDB is offering up to $50 million in one-time grants for water supply corporations. Applications are due Jan 13, 2027 at 11:59 p.m. Central. TWDB
  • Sep 24–25, 2026TWDB held a public hearing on Sep 24 on proposed Amendment No. 1 (Phase II) to the 2027 State Water Plan. Comments closed Sep 25. A board vote is tentatively set for December 2026. TWDB
  • Jul 23, 2026TWDB adopted the 2027 State Water Plan on an accelerated timeline. TWDB

All news, the timeline and key facts →

Water fights going on right now

Nine Texas water disputes, in plain words, with who is on each side and where things stand. Statuses as of Nov 14, 2026.

Read every fight in full →

Harbor Island desalination

A small state water agency wants to turn Gulf seawater into drinking water across the channel from Port Aransas. Who builds it, who pays, and where the permits stand →

Questions people ask

What is the rule of capture?

In Texas, a landowner may pump the groundwater under their place, even if a neighbor's well is affected. That's the rule of capture, a rule Texas courts have followed since the 1904 East case. A local groundwater conservation district can still set rules on how it is pumped, including permits and amounts. Texas A&M AgriLife TWDB

Do I own the water under my land?

Texas courts have said groundwater in place is a real property interest. The Texas Supreme Court said so in Edwards Aquifer Authority v. Day (2012). A local groundwater conservation district can still regulate how it is pumped, including permits, spacing and amounts, under Chapter 36 of the Water Code. Baylor Law TWDB

Can I pump from the creek on my place?

Not without a TCEQ permit, unless your use is exempt. Surface water in a creek or river is state water. Water for a household and livestock may be exempt, but you should confirm with TCEQ before you count on that for your place. An uncontested permit is typically processed in about 300 days. TCEQ

How long does a surface water permit take?

TCEQ says an uncontested surface water permit application is typically processed in 300 days. If someone contests the application, it takes longer. That 300-day figure is a typical time for an uncontested case, not a guarantee for every application. TCEQ

What is a watermaster?

A watermaster is a state official who monitors streamflow, stops illegal diversions, and divides water by priority in certain basins when there isn't enough to go around. TCEQ has four programs: Brazos, Concho River, Rio Grande, and South Texas. TCEQ

What is the Texas Water Fund?

The Texas Water Fund is a state fund created after voters passed Proposition 6 in 2023. Proposition 4 in 2025 dedicated sales tax money to it starting in 2027. The Texas Water Development Board administers the fund, which is meant to help pay for water-supply projects. TWDB

What is the State Water Plan?

The State Water Plan is the Texas Water Development Board's statewide plan, built from regional plans across the state. The current one is the 2027 State Water Plan, which the Board adopted on July 23, 2026. It is a planning document, not a permit and not a water right. TWDB

Who runs this site?

Ryan Trammell, a retired police officer who raises quail in the Canyon Lake area of the Texas Hill Country, puts this independent, plain-language guide together. It is not a law firm and not a government site. For questions or sponsorship, email [email protected]. This page was last updated November 17, 2026.

Sources for this page

  1. TCEQ: Water Rights and Water Use During Drought
  2. TWDB: Groundwater conservation districts
  3. TCEQ: Instructions for a water rights application, form 10214a (revised Apr 29, 2026)
  4. TWDB Report 361: 100 Years of Rule of Capture, From East to Groundwater Management (2004)
  5. Baylor Law Review: Kulander on Edwards Aquifer Authority v. Day
  6. TCEQ: San Saba River report (Sep 2026)
  7. TCEQ: About watermasters
  8. TWDB: Texas Water Supply Corporation grants
  9. TWDB: 2027 State Water Plan
  10. mytexas.ag.tamu.edu
  11. TWDB: Proposition 4 FAQ (Sep 2025)
  12. TCEQ: Watermaster programs